V2504 ARMSTRONG CREEK TOWN CENTRE - Sitio de proyecto público
-
16th octubre 2025, Daily Pre-Start Thursday 16/10
Crane Stage 2 Steel
Crane E Store
Sth Carpark
Mid Car Park sewer -
22nd septiembre 2025, Safety - Elevated Work Platforms
The Safety Observer Due to the importance of a prompt rescue, EWP operators should never operate an EWP alone. A safety observer should be appointed to warn the operator(s) of hazards and ensure prompt action to rescue the operator(s). The safety observer:
must be trained in the operation of the EWP and licensed where required under the legislation for the type of EWP being operated
needs to have a line of sight to the operator
needs to be trained in the emergency procedures for that specific EWP
should not leave the area until the EWP is lowered to a stowed position and the operator has alighted from the platform
Tiempo en Obra actual
Última actualización el: 3:21 PM
Temperatura: 19C (Aplicación 16C)
Velocidad del viento: 20MPH
Máx. Viento: 20MPH @3:21 PM
Lluvia desde las 9 a.m.: 0.0mm
Temp mín: 12C @10:09 PM 4/13/2026
Temp máx: 21C @2:44 PM 4/13/2026
Ráfaga: 24MPH
Ráfagas máx: 28MPH @12:31 PM
Lugar de observación - Geelong Racecourse, VICTORIA
Zona horaria - hora estándar de Australia oriental
Pronóstico - martes, 14 abril
Shower or two.
Mín: 11C Máx: 21C
Probabilidad de lluvia: 50%
Se esperan precipitaciones: 0 para 1mm
Lugar de la previsión - Geelong, VICTORIA
Zona horaria - hora estándar de Australia oriental
Mañana - miércoles, 15 abril
Showers increasing.
Mín: 11C Máx: 24C
Probabilidad de lluvia: 80%
Se esperan precipitaciones: 0 para 3mm
-
South Australian Environment Protection Act 1993 current at 20251215
Subido 12/15/2025
save_alt Descargar -
model_code_of_practice_-_managing_psychosocial_hazards_at_work_25082022_0
Subido 12/10/2025
save_alt Descargar -
Draft-Code-of-Practice_-Preparation-of-safety-data-sheets-for-hazardous-chemicals
Subido 12/10/2025
save_alt Descargar -
Draft-Code-of-Practice_-Managing-risks-of-hazardous-chemicals-in-the-workplace
Subido 12/10/2025
save_alt Descargar -
Draft-Code-of-Practice_-Labelling-of-workplace-hazardous-chemicals
Subido 12/10/2025
save_alt Descargar -
Draft-Code-of-Pracitce_-How-to-manage-and-control-asbestos-in-the-workplace
Subido 12/10/2025
save_alt Descargar -
codeofpractice_precasttiltupandconcreteelementsbuildingconstruction_2008_pdf
Subido 12/10/2025
save_alt Descargar -
Code-of-Practice_-Managing-noise-and-preventing-hearing-loss-at-work
Subido 12/10/2025
save_alt Descargar -
Generated_VIC-24-SWMS-Patching_levelling_and_grinding_of_concrete
Subido 6/30/2025
save_alt Descargar
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.
¿Conoce los requisitos de PPE para esta Obra?
Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.
Empiece a trabajar en cuanto llegue a la obra.
Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.